Drone Inspection Services

wind turbines

Drone Inspection Services for Your Business

We specialize in a variety of inspection services that are tailored to your businesses’ needs. We deliver the solutions you need by adapting our UAV technology for your specific application. Unlike other options, UAV technology is versatile, cost-effective, and removes many of the hazards associated with traditional elevated infrastructure inspections.  

Our goal is to collect the best aerial imagery for your inspection operation. We offer both live feeds and captured data so you have the instant on-site visuals you need while providing the documentation for later analysis and collaboration. We have extended capabilities to help your inspection data go further. This includes thermographic imagery and and zoom lenses for viewing small components and defects. Drones can help you improve data collection, enhance your workflow, and implement important maintenance procedures can save your business time and money.  

UAV Imaging is safer than typical inspection methods. It takes less time and doesn’t put your workforce at risk. Drones can do the work quicker and spot potential challenges or problems that a typical inspection may miss. Our drones are manned by licensed pilots who manage the pre-flight planning and logistics. Removing the human element from inspections and using drones can give you superior image quality and detail that will benefit your bottom line.

Wind Turbine Inspections
Drones are the perfect tool for wind turbine inspections. The entire turbine can be quickly imaged and inspected while removing the risk of high climbing.  
Bridge Inspections
With an upward facing gimbal the Matrice 210 RTK drone can fly under the bridge and capture close up images of the the structure above. 
Power Lines
Our system features resistance to electrometric interference, allowing for close proximity inspections of high voltage power lines .
Roof Inspections
Assess roof damage and plan repairs while eliminating the hazard of climbing the roof.  
Smokestack Inspections
Safely access smokestacks for detailed inspection and documentation. 

Our System

drone inspection services remote

Matrice 300 RTK:

  • Equipped with a H20T with a 20 times zoom and high resolution thermal camera
  • Extended flight times and hot swappable batteries means less down time
  • Live video feed from the on-board camera to the controller is relayed to external monitors/computers, allowing for easy monitoring and analysis during the flight operation
  • 4K video and high-resolution image capture for documentation and off-site analysis
  • Upward facing gimbal for flying below infrastructure  
  • SAFETY FIRST! - RTK position accuracy provides stable flight with minimal drift for close proximity inspection
drone inspection services tower